New Haven - Hartford - Springfield Rail Program
Skip Navigation
  • Home
  • Contact Us
  • Glossary
  • En Español
Hartford Line Website—Service Launched June 2018
Plan Future Trips—Easy Access to Fares & Schedules »
  • Objectives & Scope
    • Overview
    • History
    • An Expanded Regional Intermodal Network
    • Funding
    • Infrastructure Upgrades
    • Schedule
    • Interactive Program Map
  • Benefits
  • Regional Vision
  • Information Center
    • Construction Updates
    • Archived Construction Updates
    • News Briefs
    • Archived News Briefs
    • Interactive Program Map
    • Media Kit
    • Library
    • Environmental Assessment
  • Stay Informed
    • Question or Comment?
    • Glossary
    • Related Links
    • FAQs
  • Media Gallery
  • Construction Updates
  • Archived Construction Updates
  • News Briefs
  • Archived News Briefs
  • Interactive Program Map
  • Media Kit
  • Library
  • Environmental Assessment
  • Overview
  • Notice of Availability
  • Cover and Signature
  • Executive Summary
  • 1.0 Introduction
  • 2.0 Purpose and Need
  • 3.0 Alternatives Evaluation
  • 4.0 Affected Environment
  • 5.0 Agency Coordination and
    Public Involvement
  • 6.0 List of Preparers
  • 7.0 Distribution List
  • 8.0 References
  • List of Figures
  • List of Tables
  • Volume II Concept Design Drawings and Environmental Resource Graphics
  • Appendices

Get Email Updates Get Email Updates

Now is the time to get involved. Please sign up for project updates via email. (* required)

*
select
  • Berlin
  • East Hartford
  • East Long Meadow, MA
  • East Windsor
  • Enfield
  • Hamden
  • Hartford
  • Long Meadow, MA
  • Meriden
  • New Britain
  • New Haven
  • Newington
  • North Haven
  • South Windsor
  • Springfield, MA
  • Suffield
  • Wallingford
  • West Hartord
  • Windsor
  • Windsor Locks
If you do not see your City/Town from the current list, please type it in the list above.
  add me

Information Center

Environmental Assessment

8.0 References PDF File Type

8.1 Technical Reports

The Technical Reports referenced in the EA/EIE and listed below are available upon request by contacting:

Stephen V. Delpapa
Transportation Supervising Planner
Bureau of Policy & Planning
Connecticut Department of Transportation
2800 Berlin Turnpike
Newington, CT 06131-7546
Stephen.Delpapa@ct.gov

  1. Air Quality Results
  2. Data Collection/Ridership Analysis
  3. Noise Technical Memorandum
  4. Environmental Resource Analysis
  5. Project Cost Estimate
  6. Service Development Plan August 2010
  7. Traffic Operation Analysis
  8. Transportation/Transit
  9. Windsor Locks Traffic Analysis
  10. Phase 1 Wetland Report
  11. Springfield Layover Site Alternative Analysis
  12. Station Site Visit
  13. Soils and Geotechnical Report
  14. Socioeconomic Technical Report
  15. Manual for Development of System Safety Program Plans for Commuter Railroads , APTA, 2006
  16. Public Information Meetings, Local Officials Meetings, and Rail Coordination Meetings
  17. Preliminary Technical Report on Cultural Resources (Phase 1A Cultural Resources Survey)

8.2 Information from Web Sites

Information referenced in the EA/EIE and available on various web sites is listed below:

  1. U.S. Department of Transportation, Federal Railroad Administration, High-Speed Ground Transportation Noise and Vibration Impact Assessment Manual (October 2005); November, 2011
    http://www.fra.dot.gov/downloads/RRDev/final_nv.pdf
  2. U.S. Department of Transportation, Federal Transit Administration, Transit Noise and Vibration Impact Assessment (FTA-VA-90-103-06) (May 2006); November, 2011 http://www.fta.dot.gov/documents/FTA_Noise_and_Vibration_Manual.pdf
  3. Connecticut Department of Transportation, State of Connecticut Integrated Water Quality Report (April 2011); November, 2011
    http://www.ct.gov/dep/lib/dep/water/water_quality_management/305b/draft_ct_integratedwaterqualityreport_2011.pdf
  4. Connecticut Department of Transportation, Connecticut State Rail Plan; November, 2011
    http://www.ct.gov/dot/lib/dot/documents/dplansprojectsstudies/plans/state_rail_plan/State_Rail_Plan_2010.pdf
  5. U.S. Department of Transportation, Federal Railroad Administration , Railroad Corridor Transportation Plans; A Guidance Manual; November, 2011
    http://www.fra.dot.gov/downloads/rrdev/corridor_planning.pdf
    • Amtrak Acela High-Speed Rail Northeast Corridor
    • Acentech Consultants, Project Summary: Amtrak Acela High-Speed Rail Northeast Corridor; November, 2011
      http://www.acentech.com/projects/project_pdfs/amtrak-acela-high-speed-rail.pdf
    • Acentech Consultants, APTA Presentation 2011: High Speed Rail Noise and Vibration along the Northeast Corridor; November, 2011
      http://www.apta.com/mc/rail/previous/2011/Presentations/E-Wood-High-Speed-Rail-Noise-And-Vibration-pdf.pdf

©

logo: Connecticut Department of Transportation